Case Studies
-
(6)
- (4)
- (1)
- (1)
- View all
-
(5)
- (5)
-
(4)
- (3)
- (2)
- (1)
- View all
-
(4)
- (2)
- (2)
- (1)
- View all
-
(4)
- (4)
- View all 10 Technologies
ANDOR
- (2)
- (2)
- (2)
- (1)
- (1)
- View all 9 Industries
ANDOR
- (4)
- (4)
- (2)
- (2)
ANDOR
- (3)
- (3)
- (2)
- (1)
- (1)
- View all 9 Use Cases
ANDOR
- (1)
- (1)
- (1)
- (1)
- (1)
- View all 10 Suppliers
ANDOR
Please feel encouraged to schedule a call with us:
Schedule a Call
Or directly send us an email:
Compare
|
|
Making wind a reliable source of energy depends greatly on the placement of the wind turbines used to produce electricity. Turbulence is a significant factor as it strains turbine components, making them more likely to fail. Vestas wanted to pinpoint the optimal location for wind turbines to maximize power generation and reduce energy costs.
|
Download PDF
|
|
|
Each wellhead was equipped with various sensors and meters that needed to be monitored and controlled from a central HMI, often miles away from the assets in the field. Redundant solar and wind generators were installed at each wellhead to support the electrical needs of the pumpstations, temperature meters, cameras, and cellular modules. In addition to asset management and remote control capabilities, data logging for remote surveillance and alarm notifications was a key demand from the customer. Terra Ferma’s solution needed to be power efficient, reliable, and capable of supporting high-bandwidth data-feeds. They needed a multi-link cellular connection to a central server that sustained reliable and redundant monitoring and control of flow meters, temperature sensors, power supply, and event-logging; including video and image files. This open-standard network needed to interface with the existing SCADA and proprietary network management software.
|
Download PDF
|
|
|
Bridge monitoring in Hamburg Port
Kattwyk Bridge is used for both rail and road transport, and it has played an important role in the Port of Hamburg since 1973. However, the increasing pressure from traffic requires a monitoring solution. The goal of the project is to assess in real-time the bridge's status and dynamic responses to traffic and lift processes.
|
Download PDF
|
|
|
Advitam has acquired a solid expertise in civil infrastructures monitoring and assets management. During their life cycle, civil engineering structures and construction works are aging, deforming, deteriorating and their mechanical capacities are evolving. A sharp knowledge of the mechanical parameters evolution and the monitoring of physical data are key elements to define and execute predictive maintenance strategies as well as to manage the structure life cycle with balance and to ensure the required safety and security for the users of the civil engineering structure.
|
Download PDF
|
|
|
Fuel delivery has always had some built-in inefficiency. Like most fuel and lubricant distributors, Retif Oil & Fuel followed a keep full model when restocking fuel tanks and was spending too much money topping off customer fuel tanks and making emergency deliveries. Without an accurate view of customer fuel stocks it was impossible to determine who needed fuel or how much they actually needed.
|
Download PDF
|
|
|
Some public works, civil and heritage buildings have challenges in detecting abnormal structure movements in real time to maintain control of critical structure points, logging and analyzing data of all the structural properties to identify anomalies and accessing promptly to the data without the need of an on-site intervention.
|
Download PDF
|
|
|
Cisco IoE innovation Centers around the world enable and showcase local innovation and development. relayr had the unique opportunity to be involved in building the connected openBerlin infrastructure from the very beginning. In a building that was conceived from the outset to be completely monitored and controlled by smart systems, relayr set up the middle layer of connectivity – joining all of the separate legacy systems to allow meaningful cross-platform communication.
|
Download PDF
|
|
|
Using LonWorks to Keep Acela Trains Zip Along
Canadian transportation company, Bombardier was tasked with building a bullet train system on rails that were designed for lower speed trains. In addition, they had to ensure safe and optimal operation at high speeds, maximize train uptime and enhance communication with passengers.
|
Download PDF
|
|
|
Developing a control system for a vertical, floating wind turbine that can monitor the operating conditions of the turbine, control it to make sure it operates at its highest efficiency, gather and log data, and securely transfer the data to operators and developers anywhere in the world for analysis and continuous development.
|
Download PDF
|
|
|
Several Aerofiltri's products are used to measure the differential pressure on filters in air conditioning systems or for measuring air flow in ventilation ducts. A connected digital pressure gauge is needed to receive data collected in the field via web and identify pressure drop in the filters at the right time in order to prevent production delay and high maintenance costs.
|
Download PDF
|
|
|
ATM Ltd. Case Study
ATM needed a modern automation and monitoring system for an urban wastewater treatment plant in Karelia. They needed a reliable system that would best meet the needs of the modern market.
|
Download PDF
|
|
|
The Spacecraft Propulsion Research Facility at Plum Brook Station in Sandusky, Ohio is the world's largest space simulation chamber measuring 100 feet in diameter and rocketing more than six stories tall.The facility conducts tests within the vacuum chamber after the necessary electrical power, fuel, oxidizer, and purge gas connections are made. To recreate the conditions of outer space while still on earth, the test facilities rely on vacuum pumps and cryogenic systems which can simulate deep space temperatures down to -423°F. Protecting the scientists and engineers is critical to moving space missions forward safely.
|
Download PDF
|
|
|
Smart Technology Brings the Heat to Optimize Steam Heating Systems
Industrial facilities, municipalities, hospitals and universities nationwide depend upon steam carried through pipes to heat their buildings. Unfortunately, the reliability of steam systems also leads to them being forgotten or poorly maintained until it’s too late, resulting in uninsulated distribution components and faulty steam traps (leaks) that can lose hundreds or even thousands of dollars a day in wasted energy. That’s why Embedded Energy Technology (EET) teamed up with Thermaxx Jackets to create a next-generation solution for steam pipe insulation. They wanted to develop a product that not only insulated pipes, but also used technology monitor the system for leaks and heat loss. Ideally this solution would install in minutes, have no wires, and avoid the need for costly construction.
|
Download PDF
|