Case Studies
-
(6)
- (5)
- (4)
- (2)
- View all
-
(5)
- (5)
-
(2)
- (2)
- (1)
-
(2)
- (1)
- (1)
-
(1)
- (1)
- View all 5 Technologies
ANDOR
- (3)
- (3)
ANDOR
- (6)
- (1)
ANDOR
- (2)
- (1)
- (1)
- (1)
- (1)
- View all 5 Use Cases
ANDOR
- (2)
- (1)
- (1)
- (1)
- (1)
- View all 6 Suppliers
ANDOR
Please feel encouraged to schedule a call with us:
Schedule a Call
Or directly send us an email:
Compare
|
|
The Oguz-Gabala-Baku water pipeline project dates back to plans from the 1970’s. Baku’s growth was historically driven by the booming oil industry and required the import of drinking water from outside of the city. Before the construction of the pipeline, some 60 percent of the city’s households received water for only a few hours daily. After completion of the project, 75 percent of the two million Baku residents are now served around the clock with potable water, based on World Health Organization (WHO) standards. The 262-kilometer pipeline requires no pumping station, but uses the altitude differences between the Caucasian mountains and the capital to supply 432,000 m³/d to the Ceyranbatan water reservoir. To the people of Baku, the pipeline is “the most important project not only in 2010, but of the last 20 years.”
|
Download PDF
|
|
|
Water pipeline pressure needs to be kept at 0.3 Mpa in order to deliver a reliable stream of tap water to homes, businesses, and factories. Water companies use real-time monitoring systems in order to achieve consistent water pressure management that can quickly respond to any sudden drops of water pressure. System Requirements - Monitor all the distributed pressure points of a widely distributed water pipeline network - Monitor and display in real-time data from every pressure value on the central SCADA system HMI - Stable cellular communications network - High expandability
|
Download PDF
|
|
|
Water and electrical supply are two of the main concerns for public authorities. The demand of these resources grow as fast as the population in urban areas so they would become scarcer with the pass of the years. A Technavio report states that the use of smart water management technologies such as Big Data, sensoring and monitoring in real-time can help save more than USD 12 billion revenues for utilities annually.
|
Download PDF
|
|
|
The City of Turlock has a population of more than 70,000 across a 17-square-mile service territory. The City of Turlock recognized changing water conditions and the need to take action to address impacts from California's drought to ensure future availability of water for residents. The city was interested in automating its meter reading and leak detection processes in support of conservation measures.
|
Download PDF
|
|
|
The water treatment facility in Lannion, France has been tasked to treat and manage the water supply for the town and surrounding region of 22,000 people, using two plant locations to process almost two million gallons each and every day. By any standard, that’s a lot for one operation to manage and maintain all by itself. To help catch problems before they even start, they implement a water treatment facility alarm notification system.
|
Download PDF
|
|
|
Green Corporate HQ Roof
A Fortune 500 corporation wanted to reduce wet-weather discharge and enhance environmental benefits of their existing flood irrigated green roof while maintaining functionality.
|
Download PDF
|
|
|
Hydromodification
An undersized wet pond outside of Portland needed intelligent flow control function and hydromodification for improvements to water quality.
|
Download PDF
|