Case Studies
-
(2)
- (1)
- (1)
-
(1)
- (1)
-
(1)
- (1)
ANDOR
- (1)
- (1)
- (1)
- (1)
ANDOR
- (2)
- (1)
ANDOR
- (1)
ANDOR
- (1)
- (1)
ANDOR
- (6)
ANDOR
Please feel encouraged to schedule a call with us:
Schedule a Call
Or directly send us an email:
Compare
|
|
Logistics Visibility Services
Fuji Xerox faced several challenges. Delivery inquiries from distributors had to be manually associated with order information and container B/L documents. Response to delivery inquiries was slow and delivery date estimates inaccurate because Fuji Xerox had to contact each transportation carrier for shipment status updates before warehousing dates could be estimated. Manual handling of an average of 1,800 inquiries a month created an excessive workload for staff. Distributors had begun securing extra stock in a system known as just-in-case inventory to prevent inventory shortages at hub warehouses in each region, leading to chronic over-inventory
|
Download PDF
|
|
|
Obbligato for SaaS in Thailand
A large amount of engineering work involving frequent specification changes not only resulted in a nightmare for staff but also caused a considerable amount of material wastage due to miscommunication and last minute change notices. Need a system that is not too complicated to manage, and is easy to learn and use for typical employees because there a shortage of specialist IT staff and the company employs many short-term contract employees. Need an application that is not too expensive to implement, easy to use and powerful enough to handle a large volume of work.
|
Download PDF
|
|
|
Hospital Management Solution
The Oncology Diagnosis and Treatment Center of Brasov wanted to give patients as much freedom to roam as possible, while at the same time ensuring optimal patient safety and security. The centre was in need of an adequate wireless voice communication and messaging solution that would give patients the confi dence that medical staff is always on call, and reduce stress levels of nurses and doctors when called in case of urgent need.
|
Download PDF
|
|
|
The True Cost of Downtime for Manufacturers
The testing, checking and tracing of the component source is essential to produce quality products. Servicing customers when company representatives are in the field addressing possible failures. Maximum uptime. Progressive Stamping, Inc. wanted a solution that can meet all these requirements.
|
Download PDF
|
|
|
Dynamic IT Infrastructure Re-energizes Power Catalyst
Power Catalyst needed a solution that can support massive amounts of mission-critical data with no disruption for customers. Antiquated system wasn’t scalable and couldn’t support disaster recovery and could not deploy applications on a service basis with a quick turnaround.
|
Download PDF
|
|
|
Enabling Business Growth Strategies
Penn West needed a premise-based solution with a lower total cost of ownership and the flexibility to accommodate its expansion goals. Their legacy, Centrex solution was expensive and inflexible.
|
Download PDF
|