Case Studies
-
(3)
- (3)
- (2)
- (1)
-
(1)
- (1)
ANDOR
- (2)
- (1)
- (1)
- (1)
- (1)
- View all 8 Industries
ANDOR
- (2)
- (1)
- (1)
- (1)
ANDOR
- (1)
- (1)
- (1)
- (1)
ANDOR
- (3)
- (3)
- (3)
- (3)
ANDOR
- (3)
ANDOR
Please feel encouraged to schedule a call with us:
Schedule a Call
Or directly send us an email:
Compare
|
|
Steel fabrication plant processing 160MT to 200MT of steel per month.Plant wants to reduce spend on electricity. Evaluated solar panels, but project dropped due to ROI period.Plant has APFCRs to maintain a high Power Factor.
|
Download PDF
|
|
|
Ready-mix concrete batching plant with seasonal demand 6,000 to 12,000 cu.metre per month.Batch-cycle records for each truck is stored in paper format. 1000 to 2000 truck loads per month, generating ~2000 to 6000 paper records.QC anomaly detection in chemical batch-mixing is manual & time consuming.
|
Download PDF
|
|
|
An automotive components manufacturer was facing lower productivity from a relatively new automated assembly line - production 43% lower than installed capacity; new plant, 3 years old. Plant runs 24 hours, 6.5 days a week.Management is budgeting a 2nd assembly line driven by demand, but wants current productivity issues resolved.
|
Download PDF
|