Case Studies
    ANDOR
  • (1)
    • (1)
    ANDOR
  • (1)
    ANDOR
  • (1)
    ANDOR
  • (1)
    ANDOR
  • (1)
  • (1)
    ANDOR
  • (1)
Connect?
Please feel encouraged to schedule a call with us:
Schedule a Call
Or directly send us an email:
1 case study
Case Study missing? Just let us know via Add New Case Study.
Compare
Sort by:
Reducing Scrap and Increasing Efficiency in Brick Production - Craftworks Industrial IoT Case Study
Reducing Scrap and Increasing Efficiency in Brick Production
Quality management in this facility was only done at the end of the production process. This makes it hard to link scrap output to its root causes and understand when and why faulty bricks are being produced. This makes the process not only unpredictable but also inefficient.
Download PDF
test test