Case Studies
    ANDOR
  • (2)
    • (2)
  • (2)
    • (1)
    • (1)
  • (1)
    • (1)
  • (1)
    • (1)
    ANDOR
  • (1)
  • (1)
    ANDOR
  • (2)
  • (1)
    ANDOR
  • (2)
  • (1)
    ANDOR
  • (3)
Connect?
Please feel encouraged to schedule a call with us:
Schedule a Call
Or directly send us an email:
3 case studies
Case Study missing? Just let us know via Add New Case Study.
Compare
Sort by:
Jaguar Land Rover Speeds Order-to-Cash Cycle - Zebra Technologies Industrial IoT Case Study
Jaguar Land Rover Speeds Order-to-Cash Cycle
At Jaguar Land Rover, vehicles physically move around the facility for testing, configuration setting, rework and rectification, leading to a longer search time to get each vehicle to its next process facility. The main goal is to minimize the vehicles' dwell time between end of line and the delivery chain which was previously a manually intensive process. Jaguar Land Rover's goal was to build on the success of an earlier RFID project and improve the efficiency of delivering vehicles to meet dealer orders.
Download PDF
Improve Postal Mail and Package Delivery Company Efficiency and Service - Zebra Technologies Industrial IoT Case Study
Improve Postal Mail and Package Delivery Company Efficiency and Service
Postal mail and package delivery company wanted to replace legacy yard management system, increase inbound and outbound yard velocity, improve priority parcel delivery time and accuracy, reduce workload and overtime, reduce driver detention and measure performance and utilization of yard resources.
Download PDF
Zebra Enables Efficient Communication and Collaboration for Parkland Health & Ho - Zebra Technologies Industrial IoT Case Study
Zebra Enables Efficient Communication and Collaboration for Parkland Health & Ho
Due to the needs of its service area, the new healthcare campus doubled in size. With the vast size difference between the old and new hospital, Parkland had to address several issues — the most critical being adjustments in the day-today patient care provided by its clinical staff. The sheer size of the patient floors — nearly the length of two football fields — was a challenge. That size drove caregivers from a centralized care model to a decentralized one — creating the need to change how communication and collaboration happens.
Download PDF
test test