Case Studies
    ANDOR
  • (1)
    • (1)
  • (1)
    • (1)
    ANDOR
  • (1)
  • (1)
  • (1)
    ANDOR
  • (1)
  • (1)
    ANDOR
  • (1)
Connect?
Please feel encouraged to schedule a call with us:
Schedule a Call
Or directly send us an email:
1 case study
Case Study missing? Just let us know via Add New Case Study.
1 Case Study Selected
USD 10.00
Buy This List
Compare
Sort by:
WhaleDI Supports Integrated Energy Smart Services - WhaleDI Industrial IoT Case Study
WhaleDI Supports Integrated Energy Smart Services
From the sorting and analysis of past cases of digital construction in the energy field, four problems are often encountered in the process of digital upgrading of the energy industry, including the difficulty of using data in the early stage of construction, the diverse and volatile needs in the middle stage of construction, and the later stage of construction., the lack of continuous operation capability and the mismatch of safety requirements, etc.Data is difficult to use: while the amount of data is exploding, the data chimney still exists. According to the statistical analysis of relevant institutions, about 80% of the data has not been effectively used due to data silos and lack of analysis capabilities.Diverse and volatile demands: supply and demand sides, production links, and business departments have different demands for data usage. Business scenarios are complex and have low fault tolerance, making it difficult to get through the CPS (information physical system).Lack of continuous operation capability: business applications and data construction are separated, and data services cannot cope with rapid changes in business, resulting in a lack of depth and breadth of operational services and a significant drop in customer satisfaction.Mismatched security performance: comprehensive energy services require extensive access to customer data, and it is difficult to avoid data interaction security issues between internal and external networks.
Download PDF
test test