Case Studies
    ANDOR
  • (1)
    • (1)
    • (1)
    ANDOR
  • (1)
    ANDOR
  • (1)
    ANDOR
  • (1)
Connect?
Please feel encouraged to schedule a call with us:
Schedule a Call
Or directly send us an email:
1 case study
Case Study missing? Just let us know via Add New Case Study.
1 Case Study Selected
USD 10.00
Buy This List
Compare
Sort by:
ECSI installs Tellabs Optical LAN to Help Kraus-Anderson Building's Network - Tellabs Industrial IoT Case Study
ECSI installs Tellabs Optical LAN to Help Kraus-Anderson Building's Network
Kraus-Anderson (K-A) invested in constructing a new 100,000 square foot corporate headquarters in downtown Minneapolis to create a state-of-the-art campus that enabled a modern collaborative work environment, and above all, helped them attract, retain, and develop the best employee talent possible in this progressive metropolitan setting. Kraus-Anderson also knew that this forward-looking 5-story building, and its elite workforce, would demand an equally high-performance and secure network, with ubiquitous accessing through either wired or wireless connectivity.The main saught after feautres were space savings and strict security.
Download PDF
test test