Case Studies
    ANDOR
  • (4)
    • (4)
  • (3)
    • (1)
    • (1)
    • (1)
  • (1)
    • (1)
  • (1)
    • (1)
    ANDOR
  • (2)
  • (2)
  • (1)
  • (1)
  • (1)
  • View all 5 Industries
    ANDOR
  • (3)
  • (3)
  • (1)
  • (1)
    ANDOR
  • (2)
  • (2)
  • (2)
  • (1)
  • (1)
  • (1)
  • (1)
  • View all 7 Use Cases
    ANDOR
  • (1)
    ANDOR
  • (9)
Connect?
Please feel encouraged to schedule a call with us:
Schedule a Call
Or directly send us an email:
9 case studies
Case Study missing? Just let us know via Add New Case Study.
9 Case Studies Selected
USD 90.00
Buy This List
Compare
Sort by:
E.ON Gets Faster, Lower Cost Cycles with OpFlex Solutions - General Electric Industrial IoT Case Study
E.ON Gets Faster, Lower Cost Cycles with OpFlex Solutions
E.ON's plants ran 4000+ hours per year, now see fewer than 1000+ hours of profitable operation. E.ON needed a fast, reliable and low-cost cycle plants.
Download PDF
American Eagle Achieves LEED with GE LED Lighting Fixtures - General Electric Industrial IoT Case Study
American Eagle Achieves LEED with GE LED Lighting Fixtures
American Eagle Outfitters (AEO) was in the process of building a new distribution center. The AEO facility management team decided to look at alternate options for lighting layout that could provide energy and maintenance savings. AEO would need a full-time maintenance employee just to replace burned-out fluorescent tubes.
Download PDF
Unifying Predictive Analytics and Real-time Process Optimization for Oil & Gas - General Electric Industrial IoT Case Study
Unifying Predictive Analytics and Real-time Process Optimization for Oil & Gas
A leading oil & gas company and one of GE’s most trusted and innovative partners had no way of integrating independent equipment issue detection capabilities. The company was losing money as a result of unplanned downtime due to maintenance scheduling issues and outdated software systems. They believed that a well-designed combination of IT assets would generate stronger insight than they had, affording them the ability to monitor offshore equipment from an onshore facility using real-time insight and predictive analytics.
Download PDF
IIC Industrial Digital Thread (IDT) Testbed - General Electric Industrial IoT Case Study
IIC Industrial Digital Thread (IDT) Testbed
Field engineers and service teams often lack data and digital insights needed to assess, troubleshoot, and determine work scope for the large industrial assets in performing corrective and preventative maintenance activities. QA engineers many times need to understand why a particular problem in the part is happening recurrently or why parts from suppliers don’t stack up well in the assemblies due to mismatch. The root cause is usually hidden in design, manufacturing processes, supply chain logistics or production planning. But without the right data and digital insights, it's hard to pinpoint. GOAL To collect information in the design, manufacturing, service, supply-chain setup and provide access to and intelligent analytics for industrial manufacturing and performance data, to identify the root cause easier. Such insights can improve not only service and owner/operator productivity, but also provide critical feedback to the design engineering and manufacturing operations teams for continuous improvement.
Download PDF
Hardware and Software Upgrade Boosts Power Output for TransCanada - General Electric Industrial IoT Case Study
Hardware and Software Upgrade Boosts Power Output for TransCanada
As TransCanada's GE turbines were nearing end of life at their Ravenswood and Alberta locations, they required cleaner, more viable solutions to meet the growing power demands of their constituency, with the Ravenswood location serving over 20% of New York City.
Download PDF
Kospo Met Increasing Market Demands with Existing Turbine Upgrade - General Electric Industrial IoT Case Study
Kospo Met Increasing Market Demands with Existing Turbine Upgrade
Kospo needed a way to provide a higher reserve margin. Given the rise in demand due to a positive economic environment, Kospo looked to upgrade their fleet of 7F gas turbines to provide additional capacity while controlling emissions.
Download PDF
IIC High Speed Network Infrastructure Testbed - General Electric Industrial IoT Case Study
IIC High Speed Network Infrastructure Testbed
Enabling seamless machine-2-machine communications and data transfer across connected control systems, big infrastructure products, and manufacturing plants.
Download PDF
Vale Fertilizantes Saves $1.4M in Production Losses with Predix Asset Performanc - General Electric Industrial IoT Case Study
Vale Fertilizantes Saves $1.4M in Production Losses with Predix Asset Performanc
Reducing production lossesIn 2013, the company identified a need in the maintenance and operation of its acid nitric plant to reduce production losses and improve annual production. Vale noticed there was a gap in nitric acid production from 2011 to 2012 and discovered that three pieces of equipment were responsible for the main losses, including two weak acid condensers and a compressor discharge air cooler. The condenser’s losses were due to thickness loss, lack of availability of the spare condenser, and shell cracking.With a production loss above 14,000 tons in 15 months, Vale aimed to reduce annual loss by 10,000 tons by August 2015. 
Download PDF
The Convergence of Predictive and Preventative Maintenance for Mill Reliability - General Electric Industrial IoT Case Study
The Convergence of Predictive and Preventative Maintenance for Mill Reliability
Gerdau was looking to reduce their annual maintenance spend while also improving productivity, thus targeting margin improvements within their manufacturing operations. 
Download PDF
test test