Dell Technologies Case Studies The Power of Virtual Reality becomes Real in Japan
Dell Technologies Logo

The Power of Virtual Reality becomes Real in Japan

Dell Technologies
The Power of Virtual Reality becomes Real in Japan - Dell Technologies Industrial IoT Case Study
Networks & Connectivity - Gateways
Automotive
Discrete Manufacturing

To ensure business continuity in the event of an outage, AW Engineering (AW-E) wanted to upgrade the virtual desktop infrastructure (VDI) environment to the latest technology and build in a high level of redundancy.

Read More
AW Engineering (AW-E) in Japan is a leading manufacturer of automotive transition units in the world, with more than 100 employees.
Read More
AW Engineering (AW-E)
Read More

The company upgraded its existing VDI to an end-to-end Dell solution, featuring Dell PowerEdge servers, Dell storage arrays, Dell Networking switches and Dell Wyse endpoints.

Read More
Communication Performance, Downtime, Power Consumption, Power Output, Production Efficiency
Read More
[Management Effectiveness - Internal Collaboration]
Deeper integration of information across departments and business units improves internal collaboration and end-to-end customer service.
[Efficiency Improvement - Production Uptime]
The risk of system downtime is greatly reduced with several layers of redundancy built into the Dell vGPU solution, .
[Efficiency Improvement - Labor]
Employees are more productive due to an average 2.2°C cooler office environment.

Maintenance costs go down by 50%.

Power consumption is reduced by 67% through energy efficiency of the endpoints and the back-end server, storage and networking technology.

Dell solution has consolidated hardware by 45%.

Download PDF Version
test test