Muebles Liz quadruples production capacity with Lectra
Overview
Muebles Liz quadruples production capacity with LectraLectra |
Functional Applications - Manufacturing Execution Systems (MES) Functional Applications - Product Lifecycle Management Systems (PLM) Functional Applications - Remote Monitoring & Control Systems | |
Process Manufacturing Quality Assurance | |
Manufacturing System Automation Predictive Maintenance Process Control & Optimization | |
System Integration Training | |
Operational Impact
Muebles Liz tripled the number of plies they cut, from 18 to 60. | |
With VectorFurniture, cutting time per set is six times faster than manual cutting. | |
Muebles Liz now produces 400 sofas and 1200 cushions per day with VectorFurniture, whereas previously they were only producing 300 sofas and cutting all cushions by hand. | |
Quantitative Benefit
300% increase in cutting capacity. | |
16% reduction in cutting cycle time. | |
Elimination of manual cutting and consequent staff overtime hours. | |