Actian Case Studies Modernizing Railroad Infrastructures
Edit This Case Study Record
Actian Logo

Modernizing Railroad Infrastructures

Actian
Application Infrastructure & Middleware - Database Management & Storage
Application Infrastructure & Middleware - Middleware, SDKs & Libraries
Railway & Metro
Logistics & Transportation
Real-Time Location System (RTLS)
Software Design & Engineering Services
Indra Sistemas, a global technology company, was tasked with building the control centers for Spain’s AVE high-speed bullet train system. The company needed a database that could handle the complex and demanding architecture of the integrated high-speed train control system (IRC). The system was designed from a global perspective, integrating information and control from each of the elements that make up a high-speed rail line. The architecture used by Indra includes three areas of management allowing for different degrees of accessibility and control of the line. The Real-time System Control Framework consists of over 30,000 objects in memory and 30 classes, with 80 TB of information eventually flowing into Oracle’s relational database on the corporate level.
Read More
Indra Sistemas is a global company of technology, innovation, and talent. They are a leader in high value-added solutions and services for various sectors including Transport and Traffic, Energy and Industry, Public Administration and Healthcare, Finance, Insurance, Security and Defence, and Telecom and Media. Indra operates in over 100 countries and has 30,000 employees worldwide who share their knowledge of different sectors and countries to find innovative solutions to the challenges that clients face. Indra is the European company that most invests in R&D in its sector.
Read More
Indra chose the db4o object database to manage and control in all three layers of the system connecting to a relational database in the corporate network. The IRC system leverages db4o as a key data management element. db4o provides a single data model systemwide, allowing centralized monitoring, tracking and problem resolution. This element becomes increasingly important as Spain rolls out additional routes on the AVE system. Indra was able to see immediate benefits by integrating db4o into the complex Real Time System Control Framework, using db4o to store the large number of objects necessary to represent the railways real-time state. db4o’s speed allows the system to process over 200,000 objects per second.
Read More
db4o provides a single data model systemwide, allowing centralized monitoring, tracking and problem resolution.
db4o’s speed allows the system to process over 200,000 objects per second.
db4o is optimized to run in a minimal footprint and requires zero administration.
The system can process over 200,000 objects per second.
The Real-time System Control Framework consists of over 30,000 objects in memory and 30 classes, with 80 TB of information eventually flowing into Oracle’s relational database on the corporate level.
Download PDF Version
test test