Keeping the trains on track
Overview
Keeping the trains on trackSchneider Electric |
Application Infrastructure & Middleware - Data Exchange & Integration Infrastructure as a Service (IaaS) - Cloud Computing Networks & Connectivity - Network Management & Analysis Software | |
Railway & Metro | |
Logistics & Transportation | |
Predictive Maintenance Public Transportation Management Remote Asset Management | |
Software Design & Engineering Services System Integration | |
Operational Impact
The implementation of compact, highly reliable technology from Schneider Electric has enabled Queensland Rail to enhance the reliability of its services. | |
As the substation was assembled at Schneider Electric facilities, on-site work was minimized and Queensland Rail avoided as many interruptions to commuters as possible. | |
The substation offers lower maintenance costs, as all live parts are sealed to prevent exposure to pests and corrosive atmospheres. | |
Quantitative Benefit
Reduction in the number of power system incidents | |
The upgrade passed the stringent test of coping with an extra 1.5 million passengers during the Commonwealth Games | |
Engineering, installation, and commissioning costs were reduced and CapEx was lowered | |