Case Studies Here to Serve: Fast Food with Even Faster Budgets
Edit This Case Study Record

Here to Serve: Fast Food with Even Faster Budgets

Application Infrastructure & Middleware - Data Exchange & Integration
Platform as a Service (PaaS) - Data Management Platforms
Food & Beverage
Business Operation
Quality Assurance
Software Design & Engineering Services
System Integration
Tacala, the largest Taco Bell franchise owner in North America, faced significant challenges in centralizing their budgeting process across 277 retail locations over 13 different reporting periods. The existing system was plagued by version control issues between spreadsheets, SQL queries, and legacy software, leading to costly, time-consuming, and error-prone manual data collection. The need for a more efficient and accurate budgeting process was evident, as the current method was not sustainable for a company of their size and complexity.
Read More
Tacala is the largest Taco Bell franchise owner in North America, operating 277 retail locations. With revenues of $400 million, Tacala is a significant player in the fast-food industry. The company was using Microsoft Dynamics GP for their existing software needs, but faced challenges in their budgeting and reporting processes. The manual data collection and version control issues were hindering their operational efficiency, prompting the need for a more streamlined and automated solution. Tacala's user base for the new system included 15 key personnel involved in budgeting and reporting.
Read More
After exploring various options from mega-vendors to niche providers, Tacala selected Vena for its robust version control, automated workflow, central database, and seamless integration with existing source systems. The simple Excel interface of Vena led to rapid and widespread adoption among Tacala's users, with no disruption to existing processes. The implementation of Vena allowed Tacala to centralize their budgeting process, eliminate errors, and reduce the reliance on manual data collection. The integration with Microsoft Dynamics GP further streamlined their operations, providing a single source of truth for all budgeting and reporting activities.
Read More
The budgeting cycle was significantly reduced from 4-6 weeks to just 14 calendar days, thanks to the automation and centralization provided by Vena.
The elimination of version control issues and errors resulted in more accurate and trusted data, enhancing the overall reliability of the budgeting process.
End-user adoption and satisfaction were high due to the familiar Excel interface, which minimized the learning curve and ensured a smooth transition.
Tacala cut their budgeting cycle from 4-6 weeks to 14 calendar days, achieving a 2/3 cycle time reduction.
Download PDF Version
test test