GRAPHISOFT
Case Studies
Green Building with BIM Archicad: A Case Study on Eco-house 3.0
Overview
Green Building with BIM Archicad: A Case Study on Eco-house 3.0GRAPHISOFT |
Functional Applications - Manufacturing Execution Systems (MES) | |
Buildings Cement | |
Product Research & Development | |
Building Automation & Control Manufacturing Process Simulation | |
Operational Impact
The use of Archicad and BIM technology resulted in a highly efficient and precise construction process. The digitization of the design process allowed the firm to share the design process entirely in real time with the client, enhancing customer engagement and satisfaction. The use of BIM technology also allowed for a high level of precision in the design and construction process, ensuring that every detail of the house was designed down to the last millimeter. This resulted in a high-quality, energy-efficient home built in record time. The use of prefab wood modules also contributed to the speed and efficiency of the construction process. The end result was a modern, cozy, and energy-efficient home that met the owners' vision and expectations. | |
Quantitative Benefit
The house was built in record time of 10 weeks: 4 design weeks, 5 manufacturing weeks in the factory and 1 assembly week on site. | |
The house has a total floor area of 96 m2, consisting of two prefab wood modules. | |
The house was built using a 100% digital process, allowing the owners to monitor the progress of the project in real time despite being 300 kilometers away. | |