dormakaba
Case Studies
Embassy Gardens
Overview
Embassy Gardensdormakaba |
Infrastructure as a Service (IaaS) | |
Buildings Construction & Infrastructure | |
Facility Management | |
Building Automation & Control | |
Hardware Design & Engineering Services System Integration | |
Operational Impact
The FSW-G system allows maximum visibility through the glass panels, with top and bottom rails on each panel for maximum stability. | |
The folding movement creates a concertina effect, for ease of opening and closing, with a concise parked stack when opened. | |
The system allows residents to enjoy their outdoor space whatever the weather. | |