Elevating Quality to the Top Floor
Overview
Analytics & Modeling - Predictive Analytics Application Infrastructure & Middleware - Data Exchange & Integration Functional Applications - Manufacturing Execution Systems (MES) | |
Construction & Infrastructure | |
Process Manufacturing Quality Assurance | |
Predictive Maintenance Process Control & Optimization Real-Time Location System (RTLS) | |
Software Design & Engineering Services System Integration Training | |
Operational Impact
InfinityQS enabled the company to quickly identify and correct process flaws, reducing the occurrence of out-of-spec panels and minimizing job site construction delays. | |
The implementation of SPC data captured by InfinityQS reduced elevator panel production time to just 2-3 minutes per run, achieving a 40-60% time savings. | |
Automated Data Collection (ADC) saved valuable operator time, provided more accurate data, and ensured timely data collection, enhancing overall process efficiency. | |
Quantitative Benefit
Reduced Takt time to just 2-3 minutes per run, achieving a 40-60% time savings. | |
Job site construction delays caused by out-of-spec panels were reduced from 2-7 days to minimal or none. | |
Process certification time was reduced from hours to just minutes. | |