Customer Success Story: Federation Tower/ARMO Group
Overview
Customer Success Story: Federation Tower/ARMO GroupICONICS |
Application Infrastructure & Middleware - API Integration & Management Networks & Connectivity - Ethernet | |
Buildings | |
Facility Management | |
Building Automation & Control Building Energy Management | |
Software Design & Engineering Services System Integration | |
Operational Impact
The JCI M5 Workstation OEM version of ICONICS’ GENESIS32 HMI/SCADA suite provides multiple benefits including scalability as the system grows, wide integration (via BACnet, OPC, etc.), enhanced graphic visualization, Web accessibility, and more. | |
All workstations in the Central Dispatching Room are connected to a multi-functional video wall, consisting of 96 high-contrast plasma panels. | |
Throughout the year, all information about trends, alarm lists, access lists, etc., is archived to two clustered servers for network storage and can be accessed online at any time based on access permissions. | |
Quantitative Benefit
The project encompasses over 41MVA of electrical power, 5.7 and 3.8MVA of backup DGU power, 35MW of cooling and 42.5 Gigacalories of heating. | |
Over 40 JCI Network Controllers (NCMs) are utilized along with over 300 Echelon Lonworks® Field Level Controllers. | |
There are seven stationary building control/automation management workstations throughout the West Tower as well as two portable workstations. | |