China Railway's Full-lifecycle BIM Implementation on Beijing-Zhangjiakou Rail Project
Overview
China Railway's Full-lifecycle BIM Implementation on Beijing-Zhangjiakou Rail ProjectBentley |
Robots - Collaborative Robots Sensors - Temperature Sensors | |
Construction & Infrastructure Railway & Metro | |
Maintenance Product Research & Development | |
Construction Management Construction Site Monitoring | |
System Integration Testing & Certification | |
Operational Impact
CEC's use of Bentley's integrated technology to develop 3D collaborative BIM processes and standardize data structure for modeling and design purposes streamlined workflows and improved work efficiencies. The company was able to perform altitude calculations and 3D model integration in accordance with China Railway Engineering standards. The parametric modeling features facilitated efficient change management and automated 3D model generation, optimizing design while shortening modeling times. The common file format facilitated collaboration across all disciplines and reduced data transfer costs and risk throughout all phases of design. The use of Bentley’s applications for 3D multidiscipline design coordination and modeling resulted in optimized land use during construction and reduced environmental impact while still meeting the railway’s technical requirements. The collision detection features identified design errors prior to construction, which enhanced design accuracy, reduced rework, improved efficiencies, and eliminated costs associated with on-site construction changes. | |
Quantitative Benefit
Saved CNY 3 million by working on a coordinated platform that unified data, streamlined workflows, and reduced rework. | |
Reduced overall design time by three months using Bentley’s collaborative 3D BIM solution. | |
Reduced geological modeling time by six months compared to traditional methods. | |