AccuWeather's Tornado Warning Saves Lives and Ensures Business Continuity for Equipment Manufacturer

AccuWeather
Buildings
Equipment & Machinery
Facility Management
Onsite Human Safety Management
Search & Rescue
The world’s largest construction equipment manufacturer, with one of its most vital plants located in Oxford, MS, faced a potentially catastrophic situation when a devastating tornado struck the plant. The facility, which produces 1.1 million industrial couplings each month for use in almost every bulldozer, dump truck, and excavator the company produces, was directly in the path of the tornado. The disaster threatened not only the lives of the employees but also the company-wide production, putting the organization at risk of the most severe production crisis in their history. The challenge was to ensure the safety of the employees and minimize the impact on the company's operations.
Read More
The customer in this case study is the world's largest construction equipment manufacturer. One of their most vital plants is located in Oxford, MS, where it produces 1.1 million industrial couplings each month. These couplings are used in almost every bulldozer, dump truck, and excavator the company produces. The plant's operational uptime is essential to the company's overall production. The company has a robust Emergency Action Plan in place, led by a health and safety coordinator, to ensure the safety of its employees during emergencies.
Read More
The solution came in the form of a timely tornado warning issued by AccuWeather. At 5:37 pm, before the tornado hit, AccuWeather issued a warning for a storm 18 miles away. At that time, no other weather agency had issued a warning for the plant location. The warning was received via text message by the plant’s health and safety coordinator, who immediately moved 88 people into shelter per her Emergency Action Plan. At 5:59 pm, the tornado struck. Thanks to AccuWeather’s warning, no injuries occurred as everyone had moved to shelter in a safe and orderly way. The plant’s staff was able to resume operations at a nearby facility within a matter of days, showcasing a business continuity success story.
Read More
The operational results of this case study highlight the importance of timely and accurate weather warnings in ensuring the safety of employees and maintaining business continuity. Thanks to AccuWeather's warning, the plant's health and safety coordinator was able to move all 88 people into shelter, preventing any injuries. This not only saved lives but also allowed the company to resume operations quickly, minimizing the impact on production. The case study also underscores the effectiveness of the company's Emergency Action Plan, which was triggered by AccuWeather's warning and successfully averted a potential disaster.
88 people were moved to safety with 22 minutes of advance notice, preventing any injuries.
Despite severe damage to the plant, production resumed in just 13 days.
AccuWeather's warning was the only one received, highlighting its reliability and effectiveness.