Dassault Systemes
Case Studies
Pol-Eko-Aparatura Reduces development time by 50% with CATIA PLM Express
Overview
Pol-Eko-Aparatura Reduces development time by 50% with CATIA PLM ExpressDassault Systemes |
Application Infrastructure & Middleware - Data Exchange & Integration | |
Healthcare & Hospitals | |
Discrete Manufacturing Product Research & Development | |
Manufacturing System Automation Rapid Prototyping | |
Software Design & Engineering Services | |
Operational Impact
Pol-Eko-Aparatura was able to avoid costly redesign work. | |
The company was able to cut development cycle times in half. | |
The engineers were able to gain visibility and avoid downstream production problems. | |
Quantitative Benefit
Reduced development time by 50% | |
Handled a project from A to Z in half the time it would have taken before | |