Efficient Dump Design Saves Agnico Eagle $1.4 Million
Overview
Efficient Dump Design Saves Agnico Eagle $1.4 MillionDassault Systemes |
Analytics & Modeling - Real Time Analytics Application Infrastructure & Middleware - Data Exchange & Integration | |
Mining | |
Discrete Manufacturing Quality Assurance | |
Predictive Maintenance Process Control & Optimization | |
System Integration Training | |
Operational Impact
A strong mine plan and streamlined operating process that decreased hauling and construction costs. | |
A smoother process for resource updating – rapid analysis reduced evaluation time from weeks to days. | |
Significant savings by improving the layout and design of their in-pit dumps. | |
Quantitative Benefit
Saved approximately $1.4 million over the life of mine by increasing the capacity of the dump by 1.7 million tonnes. | |
Increased output by 70,000 ounces in 2013 due to improved accuracy in classifying pit material. | |
16% improvement in reserves grades in 2013. | |