Case Studies
-
(10)
- (6)
- (2)
- (2)
- View all
-
(8)
- (8)
-
(5)
- (3)
- (2)
- (2)
- View all
-
(4)
- (2)
- (2)
- (1)
- View all
-
(3)
- (1)
- (1)
- (1)
- View all 8 Technologies
ANDOR
- (6)
- (2)
- (2)
- (1)
- (1)
- View all 8 Industries
ANDOR
- (10)
- (5)
- (1)
ANDOR
- (8)
- (4)
- (1)
- (1)
- (1)
- View all 7 Use Cases
ANDOR
- (2)
- (2)
- (2)
- (2)
- (1)
- View all 15 Suppliers
ANDOR
Please feel encouraged to schedule a call with us:
Schedule a Call
Or directly send us an email:
Compare
|
![]() |
Honeywell created what it called the “intelligent system” for the National Stadium in Beijing, China, turning the venue for the opening and closing events at the 2008 Summer Olympics into a “smart building.” Designed by highly controversial artist Ai Weiwei, the “Bird’s Nest” remains one of the most impressive feats of stadium architecture in the world. The 250,000 square meter structure housed more than 100,000 athletes and spectators at a time. To accommodate such capacity, China turned to Honeywell’s EBI Integrated Building Management System to create an integrated “intelligent system” for improved building security, safety and energy efficiency.
|
Download PDF
|
|
![]() |
Sealed Air wanted to improve some of their products as their customers wanted to increase energy efficiency and compliance. To do this, they needed new insights for their products. They decided to start with the SoftCare Line soap and sanitizer dispenser.
|
Download PDF
|
|
![]() |
Recently a university in Taiwan was experiencing dramatic power usage increases due to its growing number of campus buildings and students. Aiming to analyze their power consumption and increase their power efficiency across 52 buildings, the university wanted to build a power management system utilizing web-based hardware and software. With these goals in mind, they contacted Advantech to help them develop their system and provide them with the means to save energy in the years to come.
|
Download PDF
|
|
![]() |
Many industry leaders that offer Smart Energy Management products & solutions face challenges including:How to build a scalable platform that can automatically scale-up to on-board ‘n’ number of Smart home devicesData security, solution availability, and reliability are the other critical factors to deal withHow to create a robust common IoT platform that handles any kind of smart devicesHow to enable data management capabilities that would help in intelligent decision-making
|
Download PDF
|
|
![]() |
Today's healthcare providers face a daunting challenge: sustaining or improving patient care levels despite shortages of clinicians and nurses, increasing competition, and financial pressure.
|
Download PDF
|
|
![]() |
Earth Rangers was looking for partners who could donate equipment and expertise. After earning LEED (Leadership in Energy and Environmental Design) Gold for New Construction certification, Earth Rangers decided to further demonstrate their commitment to reducing energy use and CO2 emissions by pursuing a LEED Platinum for Existing Buildings certification—the highest level of certification offered under LEED.
|
Download PDF
|
|
![]() |
Ecolibrium’s SmartSense solution connects sensors to energy infrastructure within a factory. It then sends energy consumption data, temperature and environmental data to a central platform. This data can be sent each minute, providing a near real-time view of energy consumption and analytics on where problems occur, what they are and recommendations on how to fix them. To work, each device needs robust connectivity that is simple to manage and consistent in pricing.
|
Download PDF
|
|
![]() |
Conservation of energy resources through energy management solutions are receiving considerable attention in the modern office building sector. Specific questions were directed towards average monthly energy costs and energy consumption. Meanwhile administrators need to have sufficient information about the state of their facilities’ to plan energy conservation. For those reasons, new office buildings are usually embedded with advanced technology energy efficiency features to monitor their electricity and water resources to detect leaks in the building’s plumbing and facilities usage to reduce energy costs as well as providing a comfortable office environment.
|
Download PDF
|
|
![]() |
Incorporating video surveillance with SCADA/HMI systems is now a trend for automation applications. In general, the ActiveX Control component is required to embed video images in SCADA/HMI systems. In addition to installing the ActiveX Control components, programming is also required to properly facilitate video displays and control functions. Unfortunately, the kind of programming required can pose problems for automation system integrators because they are not familiar with video technology. Moxa is working with Siemens Taiwan Building Technologies (BT) Department to develop a userfriendly tool with graphical interface for Siemens DESIGO™ system, an up-to-date BA solution of freely programmable management and automation stations for the full spectrum of building services applications, to save time and effort with programming video related functions. System Requirements • Activate live video displays when an alarm is triggered at a remote site. • Remote PTZ camera control is required, including direction control and presets control. • Audio on/off functions
|
Download PDF
|
|
![]() |
The existing chiller had proved unreliable over the previous 3 years of operation with frequent refrigerant leaks resulting in ineffective air-conditioning for the building.
|
Download PDF
|
|
![]() |
KMC Controls sought to develop a cost-effective solution to connect buildings, make them more energy efficient and safe, and help managers and owners intelligently understand and manage their properties.
|
Download PDF
|
|
![]() |
Unite Students needed to find out where and when the most energy was being expended, so they could better devise strategies to reduce energy consumption. Key to this plan was a monitor that wasn’t intrusive to the business or the residents and that didn’t require releasing staff to take meter readings.
|
Download PDF
|
|
![]() |
Green Mountain is consuming data at an unprecedented pace: 3 billion Facebook videos viewed daily; 300 hours of video uploaded to YouTube every hour. In today’s data-driven world, the uptime of colocation data centers – vast banks of servers that process everything from online videos to financial assets – is essential. Delivering secure and reliable data center services can come at an environmental cost though: energy use in data centers today contributes to 2% of global CO2 emissions. They want one colocation facility, built in a former NATO bunker buried deep within a mountain, turn the tables and use the power of nature to become one of the world’s most reliable and sustainable data centers.
|
Download PDF
|
|
![]() |
The Internet of Things (IoT), in which people, process, data, and things are connecting at unprecedented scope and scale, is making precision network connections more essential than ever before. The next generation of real estate and building services is turning workplaces and residential spaces into environments that are personalized, efficient, functional, and profitable.The innovative technology behind this type of transformation can be found in Cisco® Smart+Connected Real Estate solutions
|
Download PDF
|
|
![]() |
The building was equipped with four end-of-life Trane water cooled chillers, located in the basement. Johnson Controls installed four York water cooled centrifugal chillers with unit mounted variable speed drives and a total installed cooling capacity of 6,8 MW. Each chiller has a capacity of 1,6 MW (variable to 1.9MW depending upon condenser water temperatures). Johnson Controls needed to design the equipment in such way that it would fit the dimensional constraints of the existing plant area and plant access route but also the specific performance requirements of the client. Morgan Stanley required the chiller plant to match the building load profile, turn down to match the low load requirement when needed and provide an improvement in the Energy Efficiency Ratio across the entire operating range. Other requirements were a reduction in the chiller noise level to improve the working environment in the plant room and a wide operating envelope coupled with intelligent controls to allow possible variation in both flow rate and temperature. The latter was needed to leverage increased capacity from a reduced number of machines during the different installation phases and allow future enhancement to a variable primary flow system.
|
Download PDF
|
|
![]() |
Saving Energy on Campus with Energy Optimization Technology
The Project Universities have long put forth great effort to improve overall energy efficiency for buildings and facilities on campus. To improve electrical energy efficiency, universities have used more economical lighting systems, high efficiency motors, building management systems, and other measures. However, there is one area of electrical energy conservation that has been almost totally overlooked – the energy savings that can be realized by optimizing campus electric distribution voltages. Like many universities across the country, Murray State University (MSU) consistently looks to improve energy efficiency on campus. MSU’s 236-acre main campus is in Murray, KY, a city of approximately 18,000 residents. Founded in 1922, the university has grown from an enrollment of 202 students to 10,400 today. The University buys all its electrical power from Murray Electric System (MES), a municipally owned Tennessee Valley Authority (TVA) distribution utility. In March 2011, Utilidata deployed its AdaptiVolt™ voltage optimization software on Murray State University’s campus. The patented AdaptiVolt™ software has been installed at major electric utilities and industrial facilities in the U.S. and Canada, providing significant energy savings when implementing conservation voltage reduction.
|
Download PDF
|
|
![]() |
As energy and operational efficiencies became critical to business operations, the telecom giant could no longer rely on its existing system to draw opportunities for energy savings and operational efficiency. The old system was limited to time-clock control, and had no intelligence on occupancy or building behavior. It was time to change the defunct lighting contactor based control system in both facilities
|
Download PDF
|
|
![]() |
Optimizing Energy Utilization (Barcelona City Council)
The Barcelona City Council manages about 2000 municipal buildings and as expected the energy expenditure is very high. Hence, the objective was to closely monitor and control how these buildings are consuming and, in some cases, producing energy. Specifically, the aim was o determine the degree of utilization of energy produced by solar thermal systems in multifamily buildings. The project consisted on controlling and monitoring 28 solar thermal systems. It was divided into three phases; a pilot phase to monitor 4 initial sites, a second phase where 16 more were added, and a third phase where the final 8 were included.
|
Download PDF
|
|
![]() |
The UC Santa Cruz campus building were costly to keep illuminated at current levels. Daintree Networks attempted to reduce costs by retrofitting the entire campus building, and address limitations in the existing infrastructure. For example, as part of the retrofit, the team also considered the illumination levels and found that the levels were significantly higher than industry recommendations, a situation all too common in campus buildings.
|
Download PDF
|
|
![]() |
Lotte Department Store switched to Smart Waste Management
In order to maximize the shopping experience of their customers, Lotte Department Store wanted to minimize the waste collection frequency during operations. Whether indoors or outdoors, Lotte’s cleaning sta had to visit high traffic areas of their malls and outlets during business hours up to four times on weekdays and seven times on weekends. These frequent waste collections not only meant high operational costs but it also interfered with customers’ shopping experiences.To summarize:· Bins in high traffic areas becoming full quickly· Frequent bin emptying during store operations· Interfering with customers’ shopping experiences
|
Download PDF
|